Installation, Oven assembly – Blodgett XR8-E User Manual
Page 6
4
Installation
Oven Assembly
ASSEMBLY TO STAND
1. Center the oven frame on top of the stand so that the
oven overhangs at both the front and back.
2. Remove the three screws at the top of the left and
right side panels of the oven. Remove the side pan-
els.
3. Align the two bolt holes on each side of the stand with
the two threaded holes on each side of the oven.
4. Insert a bolt from the bottom up through each of the
two holes and tighten securely.
5. Reinstall the side panels.
Figure 1
Side view with stand
This manual is related to the following products:
See also other documents in the category Blodgett Kiln:
- SG3240G (7 pages)
- MT3255G (2 pages)
- BCX-14G (60 pages)
- B36-RAD (24 pages)
- 1200 (3 pages)
- MT3240E/G (2 pages)
- SN-5G (20 pages)
- SC-7G (20 pages)
- 900 SERIES (22 pages)
- B48N-CCCC (2 pages)
- 1201 (2 pages)
- Conveyor Oven (3 pages)
- 966 (2 pages)
- COMBI B-142G (2 pages)
- AC-500 (15 pages)
- BE2136 (2 pages)
- BC-CCNE (2 pages)
- MT3870 (2 pages)
- KLT-12G (2 pages)
- KLT-12G (26 pages)
- ELECTRIC CONVEYOR OVEN MT1828E (2 pages)
- BG3240 (36 pages)
- R11021 (17 pages)
- RE-42 (2 pages)
- MT3855G (2 pages)
- COMBI COS-20G (2 pages)
- COS (2 pages)
- 1400 SERIES (18 pages)
- COMBI BC142EDS (2 pages)
- BG2136 (2 pages)
- 1415 (2 pages)
- 1415 (13 pages)
- ZEPHAIRE-E PLUS (2 pages)
- SHO-G (2 pages)
- S1820G (50 pages)
- MT2136E/G (2 pages)
- 1405 (2 pages)
- 1200 SERIES (16 pages)
- BCM (24 pages)
- BCT (47 pages)
- BC-20E (30 pages)
- BCP (52 pages)
- BDO-100-E (15 pages)
- DFG-100-ES (26 pages)
- Zephaire-100-G-Es (25 pages)