Unpacking the switch – Allied Telesis AT-8088/xx (MT and SC) User Manual
Page 52

Installation
52
Unpacking the Switch
To unpack the switch, perform the following procedure:
1.
Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesyn.
2.
Place the switch on a level, secure surface.
3.
Make sure the following hardware components are included in
your switch package. If any item is missing or damaged, contact
your Allied Telesyn sales representative for assistance.
❑
One AT-8000 Series Fast Ethernet Switch
❑
Two mounting brackets
❑
Eight flathead Phillips screws
❑
AC power cord (AC switches only; Americas, EC, Australia, and
UK only)
❑
Management cable
❑
Documentation CD
❑
Warranty card
This manual is related to the following products: