Chapter 2, Installation, Contains the insta – Allied Telesis AT-8088/xx (MT and SC) User Manual
Page 47

47
Chapter 2
Installation
This chapter contains the installation procedures for the switch. The
chapter contains the following sections:
”Reviewing Safety Precautions” on page 48
”Selecting a Site for the Switch” on page 49
”Planning the Installation” on page 50
”Unpacking the Switch” on page 52
”Installing the Switch in a Rack” on page 53
”Installing an Optional GBIC Module” on page 55
”Installing an Optional Expansion or Stacking Module” on page 57
”Installing an Optional AT-RPS3004 Redundant Power Supply” on
”Cabling and Powering ON the Switch” on page 63
”Wiring a DC Powered Unit” on page 68
This manual is related to the following products: