beautypg.com

Installing the at-img606bd multiservice gateway, Figure 7: parts of the base unit – Allied Telesis AT-iMG606BD User Manual

Page 33

background image

AT-iMG606BD Multiservice Gateway Installation Guide

33

Installing the AT-iMG606BD Multiservice Gateway

To install the AT-iMG606BD Multiservice Gateway, perform
the following procedure:

1.

Remove all equipment from the package and store the
packaging material in a safe place.

2.

Prepare the fiber optic cable by installing an SC
connector on the end that is going to connect to the
gateway.

The base unit has three parts, as shown in Figure 7.

Figure 7. Parts of the Base Unit

383

Connector shield

Base

Cover