Allied Telesis AT-FS750/48 User Manual
Installation guide, Fast ethernet smart switch
Table of contents
Document Outline
- Electrical Safety and Emissions Standards
- Translated Safety Statements
- Contents
- Figure 1. AT-FS750/48 Front and Back Panels 17
- Figure 2. Power LED 19
- Figure 3. 10/100Base-T Port LEDs 20
- Figure 4. 10/100/1000Base-T Port LEDs 20
- Figure 5. SFP LED 21
- Figure 6. Power Workgroup Topology 26
- Figure 7. Collapsed Backbone - Hub Topology 27
- Figure 8. Attaching the Rubber Feet 35
- Figure 9. Attaching the Rack-Mount Bracket 36
- Figure 10. Mounting the Switch on the Rack 36
- Figure 11. Removing the Dust Plug from the SFP Slot 39
- Figure 12. Inserting the SFP 40
- Figure 13. Connecting the Twisted Pair Data Cables 41
- Figure 14. Removing the Dust Plug from the SFP 42
- Figure 15. Connecting the Fiber Optic Cable 42
- Figure 16. Plugging in the AC Power Cord 43
- Figure 17. AT-S86 Management Software Main Page 44
- Figure 18. RJ-45 Connector and Port Pin Layout 48
- Figures
- Table 1. Safety Symbols 12
- Table 2. Power LED 19
- Table 3. 10/100Base-T Port LEDs 20
- Table 4. 10/100/1000Base-T Port LEDs 21
- Table 5. SFP LED 21
- Table 6. Twisted Pair Cabling and Distances 33
- Table 7. MDI Pin Signals (10Base-T or 100Base-TX) 48
- Table 8. MDI-X Pin Signals (10Base-T or 100Base-TX) 48
- Table 9. RJ-45 1000Base-T Connector Pinouts 49
- Tables
- Contents
- Preface
- Chapter 1
- Overview
- Chapter 2
- Installation
- Reviewing Safety Precautions
- Selecting a Site for the Switch
- Cabling
- Unpacking the Switch
- Installing the Switch on a Desktop
- Installing the Switch in a Rack
- Installing an Optional SFP Transceiver
- Cabling and Powering On the Switch
- Starting a Management Session
- Chapter 3
- Troubleshooting
- Appendix A
- Technical Specifications