Summers Superchisel - 3-Section User Manual
Page 52
2-40
SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)
17. Check free operation of gauge wheel assembly.
– Loosen or tighten slotted nut for optimum performance of gauge wheel.
– Install 3/16” x 2” roll pin after slotted nut is adjusted properly.
17a. Adjust clearance between 8T4090 and 8T4094 with 3/4” set bolts and jam nuts.
18. Install 8K1100 axle and hub assembly into each receiver tube. Apply good quality anti-seize to
axles before installation. Retain axle into receiver tube with 1/2 x 3-3/4” bolt and locknut.
19. Attach tire/wheel to hub with 9/16” wheel bolts (torque required: 170 ft-lbs).
20. Hang trip assemblies according to layout provided.
NOTE: Steps 20-22 can be done after cylinders are filled with oil and machine is raised.
– Use 3/4” u-bolts for 4 x 4 tube with 3/4” lock washers and 3/4” nuts.
– Tighten u-bolts an equal amount on top and bottom. The same amount of threads should ap-
pear on top and bottom of u-bolt.
21. Trip assemblies located at 210” from center will be attached with 3/4” x 6-1/2” bolts. These bolts
will also hold the liftarm pivot bracket at that location.