Summers Superchisel - 3-Section User Manual
Page 43
2-31
SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)
9. Install optional wing extensions.
– One-shank extension must be placed on rear rank.
– Two-shank extension must be placed on middle two ranks.
– Three-shank extension with gauge wheel plate must be attached to the first and second
rank.
– Mounting bolts must point toward outside of machine. (Trip assembly interference will occur
if this is not followed.)
10. Install gauge wheel support (8T4090) onto wing with 7/8 x 2-1/2” bolts.
NOTE: Steps 10 through 15 may have been pre-assembled at factory.
11. Apply anti-seize to jack bolt (8T6000) threads. Screw jack bolt into axle holder (8T4094) far enough
to see hole on bottom of bolt through hole in axle holder.
– Insert 3/16 x 2” roll pin. Insert pin far enough so it will clear tube when rotated.
12. Place gauge wheel depth decal on axle holder.
– Locate decal 1” from bottom of 4 x 4 tube.
– Make sure that decal faces the front of the machine.
– Decal should be placed off to one side of axle holder to avoid seam on support tube.
13. Slide axle holder and jack bolt into gauge wheel support. Slide 1-1/4” flat washer onto bolt and
turn 1-1/4” slotted nut on.
– Do not tighten slotted nut.
14. Add gauge wheel screw top onto jack bolt.
– Insert 1/2 x 2-1/4” bolt into screw top and bolt, secure with locknut.
15. Attach gauge wheel jack handle to screw top.
– Install 3/8 x 2” bolt in handle and screw top. Secure with lock nut.
– Do not over tighten. Handle must pivot freely.