beautypg.com

Summers Superchisel - 3-Section User Manual

Page 44

background image

2-32

SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)

16. Check free operation of gauge wheel assembly.

– Loosen or tighten slotted nut for optimum performance of gauge wheel.

– Install 3/16” x 2” roll pin after slotted nut is adjusted properly.

16a. Adjust clearance between 8T4090 and 8T4094 with 3/4” set bolts and jam nuts.
17. Install 8K1100 axle and hub assembly into each receiver tube. Apply good quality anti-seize to

axles before installation. Retain axle into receiver tube with 1/2 x 3-3/4” bolt and locknut.

18. Attach tire/wheel to hub with 9/16” wheel bolts (torque required: 170 ft-lbs).
19. Hang trip assemblies according to layout provided.

NOTE: Steps 19-21 can be done after cylinders are filled with oil and machine is raised.

– Use 3/4” u-bolts for 4 x 4 tube with 3/4” lock washers and 3/4” nuts.

– Tighten u-bolts an equal amount on top and bottom. The same amount of threads should ap-

pear on top and bottom of u-bolt.

20. Trip assemblies located at 162” on 32’ base machines will be attached with 3/4 x 6-1/2” bolts.

These bolts will also hold the liftarm pivot bracket at that location.