beautypg.com

Operation sequence of operation, Fire or explosion hazard – State SBD85 365NE A User Manual

Page 25

background image

25

is locked out, the power to the unit must be cycled to restart the

Ignition Control.

8. If the pilot flame is proved during the ignition trial period, the

Ignition Control turns off the Spark Ignitor and opens the Main

Gas Valve.

9. The Ignition Control allows a 2 second pilot flame stabilization

period to insure that the pilot flame is not extinguished by the

main burner light-off process.

10. The Ignition Control monitors the Flame Sensor during the

heating cycle. If the flame signal is lost, the Ignition Control shuts

the Main Gas Valve and Pilot Gas Valve and re-starts the ignition

process at step 4.

11. Once the unit is satisfied, the Ignition Control will shut off the

Main Gas Valve and the Pilot Gas Valve and the unit will be in

standby mode until another call for heat is initiated by

the thermostat.

See the flow chart on page 26 for more information.

Light the water heater in accordance with the Lighting and

Operation Instruction label on the water heater and in this manual

on pages 27 and 28.
The water heaters covered by this manual are equipped with

an electronic control system that automatically sequences

the Igniter, the 24 VAC Gas Valve, the Burner ignition, and

flame sensing.
Before attempting start up, thoroughly study and know the exact

Sequence Of Operation. See written Sequence Of Operation on

page 25 and Sequence Of Operation Flow Chart on page 26.
Be certain that the water heater is full of water, that air is purged

from the gas and water lines and that there are no leaks in the

gas and water lines. Ensure all inlet water valves are open.

filling the water heater

Follow these steps to fill the water heater prior to start up.
1. Close the heater drain valve.
2. Open a nearby hot water faucet to permit air in system to escape.
3. Fully open the cold water inlet valve allowing the piping and

water heater to fill with water.
4. Close hot water faucet opened in Step 2 as water starts to flow.

Read SEQUENCE OF OPERATION section of this manual prior

to lighting and operating this water heater.
With above conditions satisfied, start the unit in accordance with

the instructions on the operating label attached to the heater.

For your convenience a copy of the instructions are shown on

pages 27 and 28.

Fire or Explosion Hazard

Read instruction manual before

installing, using or servicing

water heater.

To avoid risk of fire or explosion purge discharge must not

enter into confined areas or spaces where ignition can occur.

The area must be well ventilated and all sources of ignition

must be deactivated or removed.

Gas line purging is required with new piping or systems in

which air has entered.

prior to start up

Installation and start up of this water heater requires abilities and

skills equivalent to that of a licensed tradesman in the field involved,

see Qualifications on page 6.

Do not place the water heater in operation if any part has been under

water. Immediately call a qualified service technician to inspect the

water heater and to replace any part of the control system and any

gas control which has been under water.

operation

seQuence of operation

The following information will describe the Sequence of Operation

for this water heater.
1. Switch power on to unit.
2. Thermostat calls for heat.
3. Ignition Control performs diagnostic self check on system

components.

4. The Ignition Control begins the trial for ignition.
5. The Ignition Control turns on the Spark Igniter and opens the Pilot

Gas Valve.

6. The Ignition Control monitors the Flame Sensor during the ignition

trial period.

7. If the Ignition Control does not sense the pilot flame during the

ignition trial period, the Ignition Control shuts the Pilot Gas

Valve and turns off the Spark Igniter. Depending on the water

heater model, the Ignition Control will either retry the ignition trial

at step 4 or lockout the ignition sequence. If the ignition sequence