Prior to start up, Manifold kits – State GPG 81 370NEA User Manual
Page 50

50
manifold kits
Dimensions shown are for minimum space occupied by the water heaters
assemblies.
Space for the barometric draft control assemblies, combustion clearances
and servicing must be added.
prior to start up
important
Factory Start-up is required for activating warranty and assuring maximum
operating performance. Contact your local sales representatives or
Authorized Start-up Agent to arrange a Free Certified Start-up.
This manual is related to the following products: