beautypg.com

Prior to start up, Manifold kits – State GPG 81 370NEA User Manual

Page 50

background image

50

manifold kits

Dimensions shown are for minimum space occupied by the water heaters
assemblies.

Space for the barometric draft control assemblies, combustion clearances
and servicing must be added.

prior to start up

important

Factory Start-up is required for activating warranty and assuring maximum

operating performance. Contact your local sales representatives or

Authorized Start-up Agent to arrange a Free Certified Start-up.

This manual is related to the following products: