Installation preparation, Stainless steel filter duct cover bracket – GE PV970NSS User Manual
Page 12

12
49-80549-2
RECIRCULATING KIT (Included)
CHECK INSTALLATION HARDWARE
Locate the hardware package packed with the hood and check contents.
Installation Preparation
Stainless steel filter
Duct cover bracket
REAR WALL
MOUNTING TEMPLATE
V
e
rt
ical
Centerline
ALIGN BOTTOM EDGE
WITH PENCIL LINE
INDICATING BOTTOM
OF THE HOOD
11-7/16"
Installation Height
Horizontal Line
CL
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT
10-1/8"
12-08 JR
2"
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT
12-1/2"
WALL VENT IS 27-3/4" MIN.
ABOVE THE INSTALLATION
HEIGHT
31-14772 Printed in Mexico
HARDWARE PACKAGE
Locate and count
screws
6 wood screws
µ
long)
4 wall
fasteners
µVFUHZ
with wall
anchor)
8 duct cover
and air deflector
screws (#8
thread forming
VFUHZµORQJ
Charcoal filter
2-piece decorative duct cover
Wall mount template
Air deflector