Installing the mcs 5042 unit – HP Modular Cooling System User Manual
Page 10
Installation 10
Installing the MCS 5042 unit
WARNING:
The MCS 5042 unit and rack are shipped together on a heavy duty shock pallet
weighing approximately 1600 kg (3600 lb). HP recommends hiring professional movers to move
the heavy duty shock pallet, remove the MCS 5042 unit and rack from the pallet, and move the
MCS 5042 unit and rack to the final location.
CAUTION:
Contaminated water might cause decreased cooling capacity or disruption in
service. The water flowing into the MCS 5042 unit must meet the guidelines stated in the HP
mc-Series 5042 Rack Site Preparation Guide. The HP mc-Series 5042 Rack warranty does not
cover damage caused by contaminated water.
IMPORTANT:
Because the MCS 5042 unit consumes a large quantity of water, HP recommends
that you do not operate the MCS 5042 unit from a public water system such as one that supplies
drinking water. For water conservation purposes, to cool the MCS 5042 unit, use only recycled
water systems.
IMPORTANT:
Before you begin the installation process, review the HP mc-Series 5042 Rack Site
Preparation Guide.
1.
Install the HP mc-Series 5042 Hook Up Kit.
2.
Read the unpacking instructions on the MCS 5042 packaging material.
3.
Using four or more people, remove the MCS 5042 unit and rack from the pallet.
4.
Roll the MCS 5042 unit and rack to the final location.
WARNING:
To avoid tipping the MCS 5042 unit over, make sure the leveling feet are lowered
when the MCS 5042 is equipped, serviced, and operated.
5.
To adjust the leveling feet and level the MCS 5042 unit, use a bubble level.