beautypg.com

Installing the server into the rack – HP ProLiant DL385 G7 Server User Manual

Page 35

background image

Setup 35

Installing the server into the rack

CAUTION:

Always plan the rack installation so that the heaviest item is on the bottom of the

rack. Install the heaviest item first, and continue to populate the rack from the bottom to the

top.

1.

Install the server and cable management arm into the rack. For more information, see the installation
instructions that ship with the 2U Quick Deploy Rail System.

2.

Connect peripheral devices to the server.

Item Description

Color

1

PCI slot 5

2

PCI slot 6

3

PCI slot 4

4

PCI slot 2

5

PCI slot 3

6

PCI slot 1

7

Power supply 2

8

Power supply 2 connector

9

Power supply 1

10

Power supply 1 connector

11

USB connectors (2)

Black

12

Video connector

Blue

13

NIC 1 connector

14

NIC 2 connector

15

Mouse connector

Green

16

Keyboard connector

Purple

17

Serial connector

18

iLO 3 connector

19

NIC 3 connector

20

NIC 4 connector