background image

Safety Instructions

Preparation

Installation

Final Steps

English • 3

... Our Inspiration

Steps 1 through 4: Preparation

Figure 1: Cabinet Preparation

30” Minimum

Centered

30”

Min.

4” Min.

4” Min.

18”

Min.

No Clearance to

Cabinet Wall

Required **

Figure 2: Gas Supply Line and Electrical Outlet Placement

7 1/2"

4 1/2"

13 1/8 "

4"

3 7/8"

4 1/2"

3 1/2"

30"

Place Gas Supply

Line and Electrical

Outlet Here

7 1/2”

4 1/2”

13 1/8”

4”

3 7/8”

3 1/2”

4 1/2”

30”

Figure 3

1 9/16”

Flush

Cabinet Sidewall

Anti-Tip Device

Backwall

1. Install Ventilation

Bosch strongly recommends the installation of a

ventilation hood above this range. For most kitchens a

certified hood rating of not less than 300 CFM is

recommended. The range hood must be installed

according to instructions furnished with the hood.

2. Prepare Cabinets

This unit is designed for installation near adjacent walls

and projecting surfaces constructed of combustible

materials.
Allow a minimum of 30 inches between cabinets where

range is to be installed (See Figure 1)**.
Required Clearances*

From cooktop to materials above (See Figure 1)

There must be a minimum clearance of 30 inches

between the top of the cooking surface and the bottom

of an unprotected wood or metal cabinet.
24 inches is acceptable when the bottom of the wood or

metal cabinet is protected by (a) not less than 1/4" of

flame retardant material which must be covered with

(b) not less than No. 28 MSG sheet metal, 0.015 inch

stainless steel’ or 0.024 inch aluminum or copper.
From range walls to adjacent materials (See Figure 1)

No clearance is required from unit walls to adjacent

vertical combustible walls on rear, right or left.
Clearance from range top to adjacent vertical walls

must be at least 4”.
NOTE: Some cabinet finishes cannot survive the

temperatures allowed by U.L., particularly self-cleaning

ovens; the cabinets may discolor or stain. This is most

noticeable with laminated cabinets.

3. Prepare Gas Supply Line and

Electrical Outlet

The gas supply line and electrical outlet must be located

in the shaded space in Figure 2.

4. Prepare Walls and Floor

Seal any holes in the walls or floor. Remove any

obstructions (extra electrical or gas connections, etc.) so

that range will

rest against wall properly.

*Instructions were determined using standard American cabinets. Standard base cabinets measure 36" high x 24" deep . Cabinets over

the cooking surface and cabinets adjacent to those over the cooking surface measure 13 inches deep from backwall. If nonstandard

cabinets are used, care should be taken to alter dimensions accordingly.

** 12 mm clearance from range sidewall to cabinet required in Canada.

Install Anti-Tip Bracket

1. Adjust height of range and level by rotating the

adjustable leg supports on the bottom of the

range, using 1-1/4" wrench.

2. Measure to locate bracket position as shown in

Figure 8.

3. Secure bracket with 2 screws adequate for

mounting surface, not included. (i.e.; for wood

floor use wood screws, for concrete floor use

concrete anchors and screws.).

Tips:

Tape warming drawer shut to keep it from opening

while installing the range.

During installation, place a portion of the box or a

piece of cloth under the range to protect floors.

To make range lighter and easier to handle, remove

door (see instructions in Use and Care manual).