2016-C Series Hot Oil Portable Temperature Control Units

!

CAUTION

If you are routing the drain line to an open drain, make sure that the line is

directed away from personnel to avoid scalding.

Carefully select connecting lines and connectors between the 2016-C unit and

the process to best meet the needs and requirements of your application.

Make sure lines and connectors have a service rating of at least 100 psig (689.5

kPa/6.9 bars), and a temperature ratingat least equal to the maximum operating

temperature of your 2016-C unit.

Note: To prevent debris from fouling reservoir fluid, the 2016-C

unit is equipped with an internal vent on the reservoir tank.
Use the plug provided to close off the external fill port after
filling the unit with heat transfer fluid.


3-4 Making Electrical Connections

These units are designed for three-phase voltage operation. Refer
to the unit nameplate for proper voltage and amperage
requirements, and make sure your electrical service conforms.

!

CAUTION

1. Provide a correctly sized and protected power supply to the unit.

2. If an electrical supply disconnect is not installed as a factory option, the

customer is responsible to properly size and install a suitable disconnect.

3. Refer to National Electric Code (NEC) 430-24-26 for proper feed conductor

and supply disconnect sizing.

4. Voltages must be within plus or minus ten percent (±10%) of the nameplate

rating.

5. Maintain a safe ground and disconnect the power supply before servicing

the unit.

A qualified electrician should make electrical connections and disconnect the
electricity when service calls are needed.

Locate disconnects in an easily accessible location.

Operators should not have to squeeze around the 2016-C unit
to reach disconnects, especially in case of emergency.