• Additional anchoring points between the BM 26 A and the tank are recommended for very high

installations (above 6 metres length for stainless steel). The standard anchor is a set of collars
welded to a plate. This is available on demand from KROHNE. See figure below for side and
plan view and dimensions in millimetres (inches).



1.5 Start-up

procedure


WARNING

Take the necessary safety precautions when working with
pressurized tanks.



Step Action
1

Close drainage plugs and/or drainage cock .

2

Open shutoff elements at lower and upper connecting flange.

3

Adjust the position of the local measuring scale so that scale
level corresponds exactly to true level, see section 1.6.


WARNING
• The user must take the necessary steps to protect the installed instrument from

shock waves (water hammer). A pressure limiting valve must equally protect the
installation.

• The instrument must regularly undergo servicing to conform to the rules and

regulations applicable to the site that it is installed on.

• High Temperature versions - precautions must be taken to avoid burns to

operators.