beautypg.com

Section 2 - installation, 1 unpacking and inspection, 2 terminations – KEPCO BOP-HV User Manual

Page 21: Table 2-1. internal calibration controls, Unpacking and inspection -1, Terminations -1, Location of internal calibration controls -1, Internal calibration controls -1

background image

BOPHV 112211

2-1

SECTION 2 - INSTALLATION

2.1

UNPACKING AND INSPECTION

This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After carefully unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operation check as outlined in PAR. 2.5. If any indication of damage is
found, file an immediate claim with the responsible transport service.

2.2

TERMINATIONS

A)

FRONT PANEL: Refer to FIG. 2-2A and Table 2-2.

B)

REAR: Refer to FIG. 2-2B and Table 2-2.

C) INTERNAL CALIBRATION CONTROLS: Refer to FIG. 2-1 and Table 2-1.

FIGURE 2-1. LOCATION OF INTERNAL CALIBRATION CONTROLS

TABLE 2-1. INTERNAL CALIBRATION CONTROLS

REFERENCE DESIGNATION

CONTROL

PURPOSE

ADJUSTMENT PROCEDURE

R18

(±) 10V CAL.

Reference Voltage Calibration

No Operator adjustment allowed.

Refer to Service personnel.

R31

E

O

ZERO

E

O

Pre-amp Zero Adjustment

Section 3, Par. 3.3.1C

R36

I

O

ZERO

I

O

Pre-amp Zero Adjustment

Section 3, Par. 3.4.1

R303

I

OX

I

O

Stabilization Compensation

No Operator adjustment allowed.

Refer to Service personnel.