Quick start guide – AW Gear Meters RT-10 User Manual
Page 5

RT‐10 Flow Monitor
Operation and Programming Manual
4
Quick Start Guide
As with any precision‐engineered device, always use the RT‐10 in accordance with the manufacturer’s
instructions.
Installation
Secure appropriate sensor onto RT‐10 Flow Monitor. Place flow monitor with sensor into fitting in flow
meter.
Before attaching the RT‐10 Flow Monitor to the flow meter, note any potential clearance issues.
Power
A lithium battery provides the power to the RT‐10. To replace the battery, refer to Changing the Battery
on page 21.
Program K‐Factor
You must progam the K‐factor for the RT‐10 to operate. Refer to page 15.
Caution
Notice