beautypg.com

Installation, Fig. 2 – Hired-Hand Super-Savers (Forced Air Heaters) XL: Maywick SS-225-XL Rev 6-09A User Manual

Page 6

background image

Part

No.

4801-5801

Rev.

6-09

Page

6

of

23

Super Saver XL Heater Maywick

4. Installation

4.1 Hanging The Heater

Chain Suspension

Cable Suspension

Mount heater with chain hooks and chains so that
back of heater is at least 12 inches (305 mm) from
ceiling and wall. Heater must be a minimum of 20
inches (500 mm) from floor, and located so livestock
and combustible materials are unable to come in
contact with heater or within 10 ft (3 meters) of hot air
discharge.

If frequent height adjustment is required, use
cables and pulleys. Main line cable would be
connected to a winch.



4.2 Directions For Leveling

Adjust cables or chains as required
to level the heater. Use a
carpenter's level to check that the
heater is level.

4.3 Installing

Dual-Flare

Duct

Fold Dual-Flare duct to shape as
shown in Fig. 1. Install Dual-Flare
duct to heater exhaust (Fig. 1) as
shown with sheet metal screws
provided. This provides a multi-
directional heat flow that may be set
by bending flaps.

4.4 Connecting the Gas Supply

For gas connection (Fig. 2) attach
regulator to the Hi-Pressure Line (A)
at outside of building. Connect
flexible hose (B) to low pressure end
of regulator with special brass
coupling. See page 1 for LP, and
natural gas requirements.









































Fig. 2

A

B

High Pressure
Line

Gas Regulator

Flexible
hose

Fig. 2

Attach Flare
Duct To
Heater With
Sheet Metal
Screws

Adjust Flap To
Direct Heat Flow

Flare Duct

Fig. 1