Installation, Fig. 2 – Hired-Hand Super-Savers (Forced Air Heaters) XL: Maywick SS-225-XL Rev 6-09A User Manual
Page 6
Part
No.
4801-5801
Rev.
6-09
Page
6
of
23
Super Saver XL Heater Maywick
4. Installation
4.1 Hanging The Heater
Chain Suspension
Cable Suspension
Mount heater with chain hooks and chains so that
back of heater is at least 12 inches (305 mm) from
ceiling and wall. Heater must be a minimum of 20
inches (500 mm) from floor, and located so livestock
and combustible materials are unable to come in
contact with heater or within 10 ft (3 meters) of hot air
discharge.
If frequent height adjustment is required, use
cables and pulleys. Main line cable would be
connected to a winch.
4.2 Directions For Leveling
Adjust cables or chains as required
to level the heater. Use a
carpenter's level to check that the
heater is level.
4.3 Installing
Dual-Flare
Duct
Fold Dual-Flare duct to shape as
shown in Fig. 1. Install Dual-Flare
duct to heater exhaust (Fig. 1) as
shown with sheet metal screws
provided. This provides a multi-
directional heat flow that may be set
by bending flaps.
4.4 Connecting the Gas Supply
For gas connection (Fig. 2) attach
regulator to the Hi-Pressure Line (A)
at outside of building. Connect
flexible hose (B) to low pressure end
of regulator with special brass
coupling. See page 1 for LP, and
natural gas requirements.
Fig. 2
A
B
High Pressure
Line
Gas Regulator
Flexible
hose
Fig. 2
Attach Flare
Duct To
Heater With
Sheet Metal
Screws
Adjust Flap To
Direct Heat Flow
Flare Duct
Fig. 1