beautypg.com

HATZ Diesel 4H50TIC User Manual

Page 53

background image

Symbol

Maintenance in-
terval

Maintenance activity/Check

Chapter

If necessary, ev-
ery 3000 operat-
ing hours at the
latest

Replacing the poly v belts

8.2.8 Replacing
the poly v belts,
page 69

Every 4000 oper-
ating hours

Clean the entire EGR section
(EGR precooler, EGR valve,
EGR main cooler as well as
EGR mixing nozzle)
(To be carried out by a trained
specialist)

1)

Service according to service interval or after 2 years depending on which

criteria is first.
In new and generally overhauled engines, after 50 operating hours:
▪ Change the engine oil and oil filter. See the chapter 8.2.5 Changing the

engine oil and oil filter, page 59.

▪ Check the screw connections (do not retighten the screws for attaching

the cylinder head). See the chapter 8.2.10 Checking the screw connec-
tions, page 72
.

8.2.2 Checking the intake area of the combustion air

Safety notes

CAUTION

Danger of burns.
There is a danger of burns when working on a hot engine.

▪ Let the engine cool.
▪ Wear safety gloves.

NOTICE

i

In case of heavy contamination, shorten the maintenance inter-
vals accordingly (see the chapter 8.2.1 Maintenance plan,
page 52
).

Maintenance

4H50TIC

54

Operator's Manual

HATZ