Condec PIN8010 User Manual
Page 27

Maintenance & Service
21
Removal:
WARNING
Disconnect the power cord from the power source and line filter.
1. Remove the front panel from its enclosure as described in Section 4.2.1 on page 6 and carefully set on a
bench top.
2. Remove the two black wires from the pump control board TB2 terminals 1 and 2.
3. Loosen and remove the nut on the panel front and remove the switch from the panel rear.
4. Unsolder and remove the three wires from the switch terminals.
Installation:
1. Use shrink sleeving over wires/terminals for protection. Connect and solder the harness wires to the new
switch terminals per the following:
Terminal
Function
Rear of Switch
1
On
2
Off
3
Momentary
Black wire to switch terminal 1
Black wire to switch terminal 2
Black jumper wire between switch terminals 1 & 3
2. Install the new switch through the panel’s rear. Rotate the switch so the momentary position is toward the
bottom of the panel and secure it from the panel’s front with the mounting nut.
3. Replace the two black wires to the pump control board TB2. Connect terminal 1 of the switch to terminal
1 of TB2, and terminal 2 of the switch to terminal 2 of TB2.
4. Install the panel/chassis assembly in its enclosure as described in Section 4.2.1 on page 6.
4.2.21
Pump Control Board Assembly, Removal and Installation
Note
See Figure 4-1 on page 5 for wiring diagram.
120 VAC input - PN 56679, 220 VAC input - PN 56682
Tools required:
•
Phillips screwdriver
•
flat blade screwdriver (small)
•
11/32" open-end wrench or nutdriver
Removal of Pump Control Board:
WARNING
Disconnect the power cord from the power source and line filter.
1. Remove the front panel from its enclosure as described in Section 4.2.1 on page 6 and carefully set on a
bench top.
2. Disconnect the wires from the terminal blocks located on the pump control board assembly. Make note
of the wire locations for future re-connection.
3. Loosen and remove the four nuts which hold the pump control board and remove the board.
Installation of Pump Control Board:
1. Position the new board over the four standoffs and install four nuts. Tighten the nuts until they are snug.
2. Connect the wires to the terminal blocks located on the pump control board assembly.
Note
Refer to the wiring diagram Figure 4-1 on page 5.
3. Install panel/chassis assembly in its enclosure as described in Section 4.2.1 on page 6.