Nexo GEO T User Manual
Page 25
GEO
T
RIGGING PROCEDURE
Page
25/67
4.3.8 De-rigging and loading out
Taking the system down is just a case of doing the reverse procedure to flying the array. However,
there are some important factors to consider.
• Lower the array until the bottom cabinet is just off
the floor and close to horizontal position.
• Link cables must be disconnected and stowed
away in the recesses in the rear of each cabinet.
• NB : As the system is lowered it is good practise to
disconnect as many loudspeaker cables as can be
reached without climbing the array. This ensures
that a cable should not be accidentally forgotten
when the system is separated. Damage to the
connector will occur should this mistake be made.
• While holding the rear of the bottom GEO T 2815,
remove the linking bar push-pins.
• Remove front push-pins linking the two last
cabinets while supporting the bottom cabinet.
Remove the bottom GEO T2815.
• Repeat for all GEO T2815.
• NB: when one cabinet is removed, always balance
front and rear motor hoists so that the next cabinet
is close to horizontal position.
• While holding the rear of the bottom GEO T4805,
remove the linking bar push-pins and rotate the
linking bar back to the “Compression Setting
Position” at 5° so that the bottom cabinet sits flat in
the flight case.
10 GEO T 4805 + 2 GEO T 2815 SET IN TENSION MODE