Stuart Turner Monsoon Extra U3.0 bar Single User Manual
Page 3
- 3 -
Re-positioning of Pressure Vessel
The pressure vessel can be rotated to alternative positions (Figs. 4, 5 & 6) in the event of
the factory fitted position being unsuitable for a specific installation.
a) Remove pressure vessel by unscrewing anti-clockwise.
b) Using a 2 mm allen key, carefully loosen all three retaining grub screws by two
turns
(Fig.
3).
c)
Warning - Care must be taken when re-positioning the pressure vessel to
ensure no strain is placed upon the pressure
switch or reed switch cables.
The flow switch assembly can now be carefully
rotated to an alternative position
(Figs. 4, 5 & 6).
d) Ensure all three grub screws are
re-tightened securely to a torque of
2.2 Nm (1.62 lbf feet).
e) Re-fit the pressure vessel
ensuring the ‘O’-ring seal is
in place (see pre-installation
section).
Fig. 3
Grub Screws
(3 off)
Outlet Tower can be swivelled at
this joint line after loosening the
3 equi-spaced grub screws
Motor
Motor
Motor
Factory fitted position
U1.4 bar
Area for alternative fitting positions
Area for alternative fitting positions
Area for alternative fitting positions
Factory fitted position
U3.0 bar, U3.5 bar
Factory fitted position
U4.5 bar
Fig. 4
Fig. 5
Fig. 6