3 changing the process connection, Changing the process connection -2, 3 changing the process con- nection – Yokogawa EJA110A User Manual
Page 23
IM 01C21B01-01E
4-2
4 . INSTALLATION
F0403.EPS
Vertical pipe mounting
(Process connector upside)
Vertical pipe mounting
(Process connector downside)
Transmitter
mounting bolt
Transmitter
mounting bolt
Mounting bracket
Mounting bracket
U-bolt nut
U-bolt nut
U-bolt
U-bolt
50 mm(2-inch) pipe
50 mm(2-inch) pipe
Figure 4.2.3 Transmitter Mounting (Vertical Impulse Piping
Type)
4.3 Changing the Process Con-
nection
The transmitter is shipped with the process connection
specified at the time of ordering. To make a change
such as modifying the drain (vent) plug(s) attached to
the upside of the cover flange on shipment to be
attached to the downside follow the procedure below.
To begin, use a wrench to slowly and gently unscrew
the drain (vent) plug(s). Then, remove and remount
them on the opposite side. Wrap sealing tape around
the drain (vent) plug threads (*1 in the figure below),
and apply a lubricant to the threads of the drain (vent)
screw(s) (*2 below) to screw it (them) in. To tighten
the drain (vent) plugs, apply a torque of 34 to 39 N·m
{3.5 to 4 kgf·m}. Tighten the process connector bolts
uniformly to a torque of 39 to 49 N·m {4 to 5 kgf·m}.
F0404.EPS
∗
1
∗
2
Drain/vent plug
Note: For a horizontal impulse
piping type, moving the
process connectors from
the front side to the
back is not allowed.
Vertical impulse piping type
Horizontal impulse piping type
Bolt
Process
connector
gasket
Figure 4.3
Changing Process Connection