System installation requirements, Description of pcxz equipment – Progressive International Electronics PCXZ User Manual
Page 11

Progressive International Electronics
PCXZ
Version 4.2/April 2005
Page 3
PCXZinstall
System Installation
System Installation Requirements
In preparation for the PCXZ installation, ensure that the following requirements have been met.
1.
Following the manufacturer’s installation instructions, install the dispensing equipment (pumps
and data distribution boxes).
2.
Test all dispensers in stand-alone (manual) mode.
3.
Test all dispensers with same brand console to check basic dispenser functionality and
confirm a working communications link between the DBox and the dispensers. On dispensers
which have programmable identification numbers, ensure that the numbers are set correctly.
If multiple dispensers contain the same i.d. number, communication conflicts will occur.
All dispensers and communications should be functioning properly before proceeding with PCXZ
installation. If not, refer questions to the dispenser vendor/manufacturer.
Description of PCXZ Equipment
PCXZ systems are made up of the components listed below. Using this checklist, identify and
familiarize yourself with each of the components in your shipment. For further clarification, refer to the block
diagrams at the end of each dispenser section in the Dispenser & Reader Specific Installation portion of this manual.
PCXZ Equipment Checklist
U PCXZ Main Box — with connectors for POS, diagnostics and configurator box
U Configurator Box(es) — as many as 2 boxes which adapt the PCXZ to the appropriate brand(s) of fuel dispenser; wall
transformer attached
U Dispenser Connection Cable — standard 3-foot cable which connects the configurator box to the fuel dispenser
distribution box
U Config Cable — cable which connects the PCXZ board to the configurator box
U Installation Manual
U System/Test Diskette