beautypg.com

On hand, Pre-hung door assembly installation, Split jamb – ODL ON HAND In-Door Storage and Communication System User Manual

Page 7

background image

7

ON HAND

Pre-hung Door Assembly Installation

Split Jamb

DIRECTIONS

4

4

Proper frame shimming and fastening are critical to the
long term trouble-free operation of your unit.

NOTE

Re-check the door unit for plumb and square. Check
for an even margin (gap) between the door and jamb.
Check operation of the door. Make any necessary
adjustment then nail securely in place through the
jamb and shims approximately every 12" using #10
finishing nails.

Starting at the top, drive the long screws through the
hinge holes and into the stud until snug.

Score the shims using a utility knife and snap off the
excess.

Insert the opposite side of the split jamb and nail
through the outside edge of the trim using #6
finishing nails securing it to the wall, make sure
the trim is snug to the wall. Nail through the jamb
and shims on all three sides of the jamb using #10
finishing nails. Using the nail set, set all nails and fill
all nail holes.

Your door is now ready for finishing prior to installing
the ON HAND

In-Door Storage and Communication

System.

4

Setting and Fastening the Complete Door Jamb Unit

Do not overtighten the screws.

TIP