beautypg.com

Installation, Mig and water cooler process, Power wave – Lincoln Electric IM10144 POWER WAVE S700 User Manual

Page 16: S700, Figure a.5

background image

A-9

INSTALLATION

POWER WAVE

®

S700

A-9

MIG AND WATER COOLER PROCESS

RE

GUL

A

T

OR

FLO

W

M

E

T

E

R

GA

S

HOS

E

W

O

RK PI

EC

E

WO

R

K

C

L

A

M

P

TO

P

O

SI

TI

VE

(

+

)

S

T

U

D

TO

N

E

GA

TIV

E

(

-)

S

T

U

D

AR

C

L

INK C

ABL

E

K1

5

4

3-[X

X

]

FRONT

DOOR HAS B

E

EN REMOVED

T

O

SH

OW

N

C

ABL

E

C

O

N

N

EC

T

IONS

COO

L

A

RC

5

5

WA

T

E

R

C

O

O

L

E

R

PF

1

0

M

WI

R

E

F

E

E

D

E

R

M

A

GNUM

W

A

T

E

R

C

O

OL

ED

GU

N ASSEMBL

Y

K1

8

5

9-X

WA

T

E

R

H

O

S

E

K

IT

K5

90

-X

W

A

TE

R

CONN

E

C

T

ION

K

IT

FIGURE A.5