beautypg.com

B. adjustments, C. lubrication – American Dryer Corp. Phase 5 Microprocessor AD-170 User Manual

Page 9

background image

5

6 MONTHS

Inspect and remove lint accumulation in customer-furnished exhaust

duct work system. Inspect exhaust back draft dampers to insure they

are not binding. Inspect and remove ALL lint accumulation from in

and around control box area, including coin acceptors. Clean lint

accumulation from around tumbler wrapper area.

WARNING: THE ACCUMULATION OF LINT IN THE EXHAUST DUCT WORK CAN

CREATE A POTENTIAL FIRE HAZARD.

AS REQUIRED

In cleaning and care of the cabinet, avoid using harsh abrasives. A

product intended for the cleaning of appliances is recommended.

B. Adjustments

SUGGESTED INTERVAL

FUNCTION

6 MONTHS

Motor and drive belts should be examined. Cracked or seriously frayed

belts should be replaced. Tighten loose belts when necessary, and

check belt alignment.

6 MONTHS

Complete operational check of controls and valves.

6 MONTHS

Complete operational check of ALL safety devices (door switches,

sail switch, burner and lint chamber thermostats.)

12 MONTHS

Inspect bolts, nuts, screws, non-permanent gas connections, (unions,

orifices, etc.) electrical terminals, and grounding connections.

C. Lubrication

Lubrication is necessary on the fan bearings (2) 50 & 60Hz steam models, and 50Hz gas models ONLY. This

should be performed every 90 days.