beautypg.com

G. basket assembly – American Dryer Corp. Phase 5 Microprocessor AD-170 User Manual

Page 32

background image

28

4. Remove bushing, pulley, and key.

5. Assemble bushing and sheave as shown in figure "B". When cap screws are loosely inserted, bushing remains

fully expanded to provide a sliding fit on the shaft.

6. Insert key on the shaft, then slide sheave to desired position with cap screw heads to the outside.

7. Tighten cap screws progressively. There should remain a gap between the sheave hub and the

flange of the bushing.

IMPORTANT: Tighten screws evenly and progressively. Never allow the sheave to be drawn

in contact with the flange of the bushing. This gap should measure from 1/8"

to 1/4". Proper cap screw torque is 6 ft-lbs., if greater tightening forces are

applied, excess pressures will be created in the hub of the mounted sheave

which may cause it to crack.

G. Basket Assembly

Basket Alignment (Vertical)

(Up and Down Adjustment)

1. Discontinue power to dryer.

2. Remove background.

3. Loosen the two (2) vertical holding

bolts on the side at the top of the

bearing box (1 on each side).

4. Back off jam nuts on vertical adjustment

bolts.

5. Turn these bolts clockwise evenly to raise

basket or counterclockwise evenly to lower

basket.

6. Rotate basket from front and check alignment

with front door opening.

7. Leave a larger gap from the inside ring on the top of the front panel opening to the basket and a smaller gap on

the bottom to compensate for the weight of the clothes when wet.

8. Retighten the two (2) vertical holding bolts on the sides, at the top of the bearing box, and the jam nuts on the

two (2) vertical adjustment bolts.

9. Check basket drive belt for proper tension. Adjust if necessary. (Refer to Section I, page 7)

10. Replace backguard.

11. Reestablish power to dryer.