beautypg.com

Hauler Racks Universal Steel Truck/Cap Rack (STC3-1) User Manual

Page 8

background image

8 of 16

HAULER RACKS, INC.
7109 31

st

Avenue North

Minneapolis, MN 55427-2848
WWW.HAULERRACKS.COM

Toll Free: 1-800-843-5445

Phone: 763-546-5620

Fax: 763-546-0933

Step 7 Front Rail assembly

Slide the front rail through the front legs and line up the bolt holes for 10’ length.

If a shorter length is desired, slide the front rail into the rear rail to the desired position. Mark the holes. Remove
front rail and drill holes. Reinsert the front rail into the rear and line up holes.

Align the bolt holes and secure with (with (2) 3/8”-16 x 2-3/4” bolts, (4) flat washers and (2) 3/8”-16 nylon insert lock
nuts.

Seal the gap between the rails with silicone.

Repeat for other side.

Insert 1-3/4” square end caps into the front rails.