Fairbanks 12-1492 - 12-1496 A.A.R. Combination Railroad Track/MTS User Manual
Page 18
04/12
18
50538 Rev. 7
5. Has the service technician thoroughly reviewed the installation procedures?
6. Has the service technician reviewed the recommended setup with the Area Sales Manager
or Area Service Manager, and identified all necessary variations to satisfy the customer's par-
ticular application?
2-C: Unpacking:
1. Check that all components and accessories are on hand, and agree with the customer's
order.
2. Remove all components from their packing material, checking to make certain that all parts
are accounted for and no parts are damaged. Advise the shipper immediately, if damage has
occurred. Order any parts necessary to replace those which have been damaged. Keep the
shipping container and packing material for future use. Check the packing list.
3. Collect all necessary installation manuals and prints, including Certified Prints, for the
Scale being installed.
2-D: Safety:
As is the case with any material handling equipment, certain safety precautions should be
observed during operation:
1. Never load the platform beyond its rated capacity. Refer to the rating on the serial number
plate if in doubt.
2. Ensure that any structure which supports the platform is capable of withstanding the weight
of the platform plus its rated capacity load.
3. Do not load the platform if there is any evidence of damage to the platform or supporting
structure.
4. Use safety chains or other suitable restraining devices if there is any possibility of the load
shifting, falling, or rolling from its position on the load receiver.
5. Do not leave the platform unattended when it is loaded.