Section 2: Installation:
2-A: General Service Policy
Prior to installation, it must be verified that the equipment will satisfy the customer's require-
ments as supplied, and as described in this manual. If the equipment cannot satisfy the appli-
cation and the application cannot be modified to meet the design parameters of the equip-
ment, the installation should not be attempted.
Overview:
1. These instructions apply to the Scale Platform only; installation procedures for instrumenta-
tion, printers and other peripherals are given in manuals specifically provided for those units.
The instructions include a pre-installation checkout, which must be performed before the
installation.
2. All electronic and mechanical calibrations and or adjustments required to make this equip-
ment perform to accuracy and operational specifications are considered to be part of the
installation, and are included in the installation charge. Only those charges which are incurred
as a result of the equipment's inability to be adjusted or calibrated to performance specifica-
tions may be charged to warranty.
3. Absolutely no physical or electrical modifications are to be made to this equipment.
Electrical connections other than those specified may not be performed, and no physical
alterations (mounting holes, etc.) are allowed.
4. The installing technician is responsible to make certain that personnel are fully trained and
familiar with the capabilities and limitations of the equipment before the installation is consid-
ered complete.
2-B: Pre-Installation Checklist:
The following points should be checked and discussed with the Area Sales Manager and/or
customer, if necessary, before the technician goes to the site to install the equipment.
1. Has the customer's application been checked to make certain that it is within the capabili-
ties and design parameters of the equipment?
2. If the installation will disrupt the customer's normal operations, is he aware and has he
made arrangements?
3. Is properly-grounded power available at the installation location?
4. Will the equipment operator(s) be available for training?