2.1.2. Assembling the Pillar
5. At the Wheel-base side of the
Platform, remove the four (4)
Fastening Bolts of the Cover using
the
seven-sixteenths inch
(
7/16”) Open-ended Wrench
.
6. Pull out and unwrap the cables, set
the instructional CD aside, then open
the bag of assembly hardware.
7. Using the pre-assembled Pull-string, carefully draw the Indicator Cable up
through the Pillar, and then out through the top Access Hole.
−
Allow extra slack on the cable.
8. Insert the Pillar into its collar on the Base.
9. Pull the cable firmly at the top to remove the slack.
10. Install the rubber boot over the load cell
cable and into the cable exit hole.
11. Use two
Open-ended Wrenches.
A
9/16”
on the 3/8” x 3-1/2” Bolts
through the Pillar and on the
Fastening
Nuts.
12. Tighten the (2) ¼” x .50” Bolts using a
7/16” Open-ended Wriench
to
secure the pillar to the base.
13. Wrap up excess Load Cell Cable and
secure in the compartment at the base
of the pillar.
14. Reinstall the Cover on the Platform with
the six (6) Fastening Bolts.