Section 2: Operations
2.1. INTRODUCTION
The installing technician is responsible that all personnel are fully
trained and familiar with the equipment's capabilities and
limitations before the installation is considered complete.
The
Fairbanks Transport Scale Platform
arrives at the user’s site partially
assembled.
The Instrument Pillar must be inserted into the Platform Base, and then fastened.
2.1.1. Unpacking
Follow these guidelines when unpacking all equipment.
• Check in all components and accessories according to the customer's order.
• Remove all components from their packing material, checking against the
invoice that they are accounted for and not damaged.
─ Advise the shipper immediately, if damage has occurred.
─ Order any parts necessary to replace those which have been damaged.
─ Keep the shipping container and packing material for future use.
─ Check the packing list.
• Collect all necessary installation manuals for the equipment and
accessories.
• Open the Indicator box(es), then follow exactly all the accompanying instructions
in the Installation Manual.
The Transport Scale is shipped in a wooden
crate on top of a pallet.
1. Remove the crate lid.
2. Locate the side closest to the wheels,
positioning it like a ramp in the
illustration.
3. Install the pillar to the base assembly.
4. Wheel the Scale off of the shipping
crate.