Direct Lift PP9 Plus User Manual
Page 3
![background image](/manuals/346987/3/background.png)
3
• OPERATION INSTRUCTIONS .................................................................................................................. pg 13
• PREVENTIVE MAINTENANCE SCHEDULE ........................................................................................... pg 15
• TROUBLESHOOTING ............................................................................................................................... pg 17
• CABLE INSPECTION GUIDE ................................................................................................................... pg 19
• ILLUSTRATED PARTS LIST...................................................................................................................... pg 26
IMPORTANT INFORMATION
Four Post Lifts
1. Always inspect the lift for damage and make note of any damage on the bill of lading.
2. In case of freight damage, call the truck line immediately and report the damage as a freight claim.
3. Make sure you have extra help or heavy duty lifting equipment when unloading and assembling the lift.
4. Please read the safety procedures and operating instructions in this manual before operating lift.
Keep this manual near lift at all times. Make sure all operators read this manual.
5. NOTE: Are you installing in a level location? (Lift must be anchored in place if slope is greater than
1/8" per foot.)
6. Make sure you have enough room to install the lock rods. You will need at least 9’ of clearance from
the opposite end of the power unit end of the lift and 6’ at the power unit end. (See floor plan on page
7. The power unit may be installed on the driver’s front or the passenger rear corner.
8. Never raise a car until you have double checked all bolts, nuts and hose fittings.
9. Always lock the lift before going under the vehicle or storing another vehicle underneath lift.
Never allow anyone to go under the lift when raising or lowering.