beautypg.com

Direct Lift PP9 Plus User Manual

Page 16

background image

16

CAUTION NOTE !!

LUBRICATE ALL CABLE SHEAVES, BEARINGS, AND SHAFTS WITH GREASE PRIOR TO OPERATING THE LIFT.

LUBRICATE ALL ON AN ANNUAL BASIS.

Motors and all electrical components are not sealed against the weather and moisture. Install this lift in a pro-

tected indoor location. Failure by the owner to provide the recommended shelter could result in unsatisfactory

lift performance, property damage, or personal injury.

Read and heed all WARNING, CAUTION and SAFETY INSTRUCTION labels on lift.

PREVENTIVE MAINTENANCE SCHEDULE

The periodic Preventive Maintenance Schedule given is the suggested minimum requirements and minimum

intervals; accumulated hours or monthly period, which ever comes sooner.

Periodic maintenance is to be performed on a daily, weekly, and yearly basis as given in the following para-

graphs.

In the event you need replacement parts, use only Direct Lift replacement parts available from your local Direct

Lift distributor.

Do not modify the lift in any manner without the prior written consent of the manufacturer.

WARNING!!

Occupational Safety and Health Administration (OSHA) and the American National Standards Institute (ANSI)

requires users to inspect lifting equipment at the start of every shift. These and other periodic inspections are

the responsibility of the user.

Failure to perform the daily pre-operational check can result in expensive property damage, lost production time,

serious personal injury, and even death. The safety latch system must be checked and working properly before

the lift is put to use.

Failure to heed this warning can result in death or serious injury, or damage to equipment. If you hear a noise not

associated with normal lift operation, or, if there is any indications of impending lift failure - CEASE OPERATION

IMMEDIATELY! - Inspect, correct and/or replace parts as required. Use only Direct Lift replacement parts avail-

able from your local Direct Lift distributor.

Daily Pre-Operation Check (8-Hours)

Check safety lock audibly and visually while in operation

Check safety latches for free movement and full engagement with rack.

Check hydraulic connections, and hoses for leakage.

Check cables connections bends, cracks-and for loose fittings.