beautypg.com

0 preventative/scheduled maintenance, Green class net meter – E-Mon E50-6003200J*-N-KIT User Manual

Page 33

background image

GREEN CLASS NET METER

33

62-0416-01

NOTE: One set of current sensors equates to three sensors, one per phase. The

multiplier only applies when extra sets of current sensors are installed on one

meter. If you are using only one set of three current sensors, the multiplier is

not required.

Fig. 17. Multiple-load Wiring Diagram.

8.0 PREVENTATIVE/SCHEDULED

MAINTENANCE

The unit is shipped in a calibrated and fully functional tested condition. Since the unit is

factory-calibrated using proprietary firmware algorithms, no internal unit adjustments

are necessary.

This unit contains no internal adjustments, so no preventative or scheduled

maintenance is required.

No cleaning or decontamination procedures are required for this instrument.

LINE VOLTAGE

ØA

ØB

LOAD SOURCE

N

LOAD A

LOAD B

CURRENT SENSORS

LOAD SOURCE

ØA

ØB

N

M31603

ØC

ØC

ØAØB ØC

ØA

ØB ØC

W B W B W B

N