Hardware installation – Teledyne 6650 - Fluorescence Probe - Oil in Water analysis system User Manual
Page 17
UV-Photo-X Hardware
Installation
Teledyne
Analytical
Instruments
9
Hardware Installation
In addition to the physical, optical, and electrical installation
requirements of the Fluorometer it is recommended that the transmitter
be placed in a clean, dry area of the plant. If the local area of where the
electronics are mounted exceeds our upper temperature limit of 115°F, it
is recommended that the transmitter be moved or purged with plant air
that can act to remove heat from building up inside of the enclosure.
Please follow the outlined sections below as a guideline to
installing the Fluorometer in your plant environment.
4.1 Physical
1) Bolt the Fluorometer in place using mounting screws to a secure,
rigid surface.
2) Run required electrical wiring for instrument power and 4-20
mA output signals.
Run required dry and oil free purge air for the unit.
3) Run fiber optic cable in conduit or other appropriate protective
measure as desired.
4) Install probe in sensing location, making sure there are no leaks
and the probe has been fully tested for process conditions such as
temperature and pressure.
4.2 Optical
To remove or install the fiber optic cables from the
probe, the following needs to be done:
1) Unscrew the optic cables from the bottom of the light source
and the control unit.
2) Unscrew the liquid tight connector’s 1 ¾” nut which is
connected to the conduit from the other part.
3) Remove the probe bracket from wherever it’s attached to.