beautypg.com

Maintenance – Teledyne 3010MB - Split architecture paramagnetic oxygen analyzer User Manual

Page 53

background image

Part I: Control Unit

Maintenance 5

Part I: 5-1

Teledyne Analytical Instruments

Maintenance

Aside from normal cleaning and checking for leaks at the gas connec-

tions, routine maintenance is limited to replacing fuses, and recalibration.

Checking for leaks, and replacing fuses in the Analysis Unit are cov-

ered in Part II, Chapter 5. For recalibration, see Part I, section 4.4 Calibra-
tion
.

WARNING: SEE WARNINGS ON THE TITLE PAGE OF THIS

MANUAL.

5.1

Fuse Replacement

The 3010MB requires two 5 x 20 mm, 1.0 A, T type (Slow Blow)

fuses.

The fuses are located inside the main housing on the Electrical

Connector Panel, as shown in Figure 5-3. To replace a fuse:

1. Disconnect the Unit from its power source.

2. Place a small screwdriver in the notch in the fuse

holder cap, push in, and rotate 1/4 turn. The cap will
pop out a few millimeters. Pull out the fuse cap and
fuse, as shown in Figure 5-1