beautypg.com

Operation, Flame programmers – Fulton Classic ICX or FB-F Vertical Tubeless Boilers (Hot Water), Gas_Oil Fired User Manual

Page 27

background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 3

ICW-IOM-2014-0410

OPERATION

3-5

!

WARNING

All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.

Do not attempt to start the
equipment for any testing prior
to fi lling and purging the vessel.
A dry fi re will seriously damage
the equipment and may result in
property damage or personnel injury
and is not covered by warranty. In
case of a dry fi ring event, shut off
the fuel supply and allow the vessel
to cool to room temperature before
fl uid is reintroduced to the pressure
vessel.

4

CAUTION

A qualifi ed installer, service agency
or the gas supplier must perform
installation and service on the fuel
delivery system.

Before commissioning the equipment,
verify with authorized personnel that
the gas lines have been purged.

Never attempt to operate equipment
that has failed to pass all the safety
checks.

After checking controls by manual
adjustment, make sure they are always
reset to their proper settings. Contact
your Fulton dealer before modifying the
equipment.

STARTING THE BURNER  GAS

1. Verify incoming gas pressure.

2. Open the manual gas cocks on the pilot and main lines on the gas head.

3. Switch on the main power to the burner. If the water level relay is equipped

with manual reset, depress the button on the box.

4. Check motor rotation.

5. Start the burner by turning on the switch on the outside of the panel box.

The blower motor will begin to deliver air into the furnace.

6. When

suffi

cient air pressure has built up in the blower housing, the air

switch located on the top side of the blower housing will make contact
and after a seven-second delay, will allow the ignition transformer and
pilot valve to operate. This creates pilot fi re.

7. When the pilot fl ame is established, the fl ame rod or UV scanner senses

the electrical current (microamps). The signal is transmitted to the
protectorelay, which opens the main gas valve for full fi re.

NOTE:

For new installations/burner has been disassembled, the burner may not

fi re upon fi rst attempt because air must be cleared from gas lines. The burner
protectorelay may go into lockout mode; allow a period of one minute to elapse,
then repeat procedure for starting the burner.

STARTING THE BURNER  OIL

1. Open the oil line’s shut-off valves.

2. Verify oil is present at the oil pump.

3. Switch on main power to burner. If the water level relay is equipped with

manual reset, depress the button on the box.

4. Start the burner by turning on the switch on the outside of the panel box.

The blower motor will begin to deliver air into the furnace.

5. As the blower starts, the magnetic oil valve is energized, allowing the oil

pump to deliver fuel for ignition.

6. If the protectorelay does not sense ignition via the CAD cell or UV scanner

located on the top of the burner in approximately 15 seconds, it will shut
down the burner.

Flame Programmers

Refer to inserts provided.