beautypg.com

Final heater assembly – Detroit Radiant Products Company LD3 Series User Manual

Page 22

background image

50,000 BTU/h Models

22

LD3

Series

Final Heater Assembly

Chart 3.6

Tube Installation Sequence and Secured Joints for Reflectors

40,000 BTU/h Models

3.0

Installation

Final Heater Assembly

A

B

A

A

D

D

C

B

D

4” to 3” Tapered Titanium Treated
Combustion Chamber with 4” Stainless
Steel Clamp

3” Aluminized Radiant Tube Exchanger
with 3” Clamp

4” Titanium Treated Combustion
Chamber with 4” Stainless Steel Clamp

4” to 3” Tapered Aluminized Steel
Tube Exchanger with 4” Clamp

C

D

C

B

C

B

NOTE: When securing joints on
reflectors which are rotated on
an angle from horizontal, secure
joint only on top side of reflector
to allow for sufficient heater
expansion and contraction.

1 to 45° Mounting Angle

0° Mounting Angle

30 Foot

20 Foot

15 Foot

15 Foot

20 Foot

Burner Control Box
w/16 in. Burner Tube

Key

Expansion Joint on
Reflectors

Secured Joint on
Reflectors (see note)

Secure vent material to exchanger with
three #8 sheet metal screws. Seal with
high temperature silicone sealant. Do
not use tube clamp.