Detroit Radiant Products Company LD3 Series User Manual
Page 14
14
LD3
Series
7
S-Hook and
#1 Double-Loop Chain
5
Prepare mounting surface, if necessary weld blocks, drill holes (see figure 3.3).
NOTE: The burner control box and radiant tubes should be in straight alignment and level.
6
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
7
Attach and close S-hook (P/N: S-Hook) and #1 double-loop chain (P/N: THCS) to anchor. Check that
it is securely attached.
NOTE: Threaded rod and turnbuckles may be used.
8
Attach hangers to chains. Adjust chain lengths until radiant tubing is level and equal weight distribution
is achieved. Chains must be straight up and down. Do not install chains at an angle as this can result
in tube warpage or separation.
Figure 3.3
•
Mounting the Hangers
5
Wood Beam
5
Concrete Beam
6
Beam Clamp
6
Screw Hook
6
Screw hook
with Locknut
and Washer
7
Threaded Rod
and Turnbuckle
8
Chain
5
I-Beam
6
Beam Clamp
8
Chain
8
Chain
5
I-Beam
3.0
Installation
•
Hanger Placement and Suspension