Burner control box suspension – Detroit Radiant Products Company LD3 Series User Manual
Page 19
19
LD3
Series
Burner Control Box Suspension
Suspending the burner control box must be done in accordance with applicable codes listed in the Safety
section and these instructions.
The burner control box must be in straight alignment with radiant tubes and level. Contact your local
distributor or the factory to see if your application allows for the rotation of the burner control box.
1
Determine the mounting chain locations for hanging the burner control box.
2
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
3
Attach S-hook and #1 double loop chain (P/N: THCS) to anchor. Check that it is securely connected.
4
Attach chain assemblies and S-hooks to mounting brackets on the burner control box. Adjust chain lengths
until level and in straight alignment with radiant tubes. Burner sight glass will be visible from the floor.
Figure 3.12
•
Burner Control Box Assembly
•
Side View
3.0
Installation
•
Burner Control Box Suspension
32.5”
4.5”
8.625”
18.5”
4”
11.25”
15”
Figure 3.13
•
Burner Control Box showing U-Shaped Configuration
•
End View
Burner
Sight Glass
16 in. burner tube is in straight
alignment with combustion chamber
9.625”
16”
12.875”
TP-1077
3” Tube Clamp
TP-1079 3” Hanger
TP-19B
4” Hanger
TP- 220 4” Stainless
Steel Tube Clamp
1
2
3
4