beautypg.com

Parts requirements – Liquid Controls LCR Install User Manual

Page 7

background image

7

Parts Requirements

Liquid Controls Supplied Components
LCR register, and LC-supplied options including; printer,
Lap Pad, control valve or solenoid, ETVC kit, glandless
pulse output device (POD), odometer kit, preset switch,
remote START/STOP switch, communication protocol
selector switch (RS232/485), power cable, and printer/
Lap Pad cable.

Removing Existing Mechanical Registration Equipment

Liquid Controls Meters
Remove the mechanical register components by
removing the four bolts that attach the register “stack” to
the meter. (See illustration below).

Neptune Fuel Oil Meters
Remove the mechanical register from the meter, leaving
just the star shaped gear and two square headed studs.

Removing mechanical register stack from Liquid Controls meter (typical).

!

!

!

!

!

WARNING

WARNING

WARNING

WARNING

WARNING

Before disassembly of any meter or accessory component, ALL INTERNAL PRESSURES MUST BE RELIEVED
AND ALL LIQUID DRAINED FROM THE SYSTEM IN ACCORDANCE WITH ALL APPLICABLE PROCEDURES

.

Pressure must be 0 (zero) psi. Close all liquid and vapor lines between the meter and liquid or gas pressure source.

For Safety Rules regarding LPG, refer to NFPA Pamphlet 58 and local authorities.

Failure to follow this warning could result in property damage, personal injury, or death from fire and/or explosion, or
other hazards that may be associated with this type of product.

Installer Supplied Parts

All conduit/cable glands

All fittings

Hardware for printer mounting brackets

Non-standard cables or cable extensions

Neptune LPG Meters with Mechanical TVC’s
Remove the mechanical register and the mechanical
automatic temperature compensator from the meter
leaving just the star shaped gear.