Solar Applications

NOTE:

Viking recommends Solar Package (

part # VA-SOCHP) for most general solar

applications. Alternatively, individual and third party solar components can be used.
The following are minimum system requirements and installation information.

APPENDIX (C)

If more specific information is needed please consult with Viking Access Systems.
For more information regarding solar energy refer to www.nrel.gov/solar

Batteries & Fuse

Voltage 24V

Amp Hour 35Ah (minimum)

Fuse

10A

(minimum)

Replace the operators batteries with
35Ah or greater.

Panels

• Voltage 24V
• Wattage 80W (minimum)
Cut the wires coming from the toroidal
transformer.
Connect the solar panel cables to the
power harness as shown.

!

IMPORTANT:

The chart provided can be used as a guide to an idea of the number of

cycles the gate will operate per day. The chart is for a single gate operator with just:
a. One Radio Receiver
b. One low voltage, low current loop detector
c. One low voltage, low current photo beam