Gate operator installation, Technical tip, Step 1 – Controlled Products Systems Group L3NX User Manual
Page 19: Step 2
![background image](/manuals/334984/19/background.png)
VIKING TECHNICAL SUPPORT 1.800.908.0884
1 7
GATE OPERATOR INSTALLATION
!
TECHNICAL TIP:
Before starting the installation procedure;
• Open and close the gate manually, making sure there is sufficient space between the gate
and adjacent walls.
• Check that the wheels are turning freely on the track and there are no restrictions while
pushing the gate to the open and closed positions.
• Confirm that there is adequate spacing for the guide rollers and that there are no
restrictions throughout the travel of the gate.
STEP 1
Before securing the chassis to the
concrete pad or posts, make sure
the gate and operator is LEVEL and
PARALLEL. Minimum distance between
the operator and gate is 3”.
STEP 2
Chain Installation: Before welding the
provided chain brackets, make sure the
chain will be in a straight line with, and at
the same height as, the chain leaving the
gate operator rollers.
14.375"
- GNC-1 (1 page)
- -108712 (33 pages)
- 1044372 (28 pages)
- 1042071277 (28 pages)
- 104207177 (28 pages)
- 104301 (30 pages)
- 10441811 (29 pages)
- 1044182 (28 pages)
- 1044682 (28 pages)
- 104471 (28 pages)
- 104572 (24 pages)
- 104572 (27 pages)
- 10468583 (36 pages)
- 1049062 (17 pages)
- 106753 (28 pages)
- 108758 (40 pages)
- 109773 (19 pages)
- 10978021 (6 pages)
- 109902 (27 pages)
- 1150-080 (30 pages)
- 1600 (17 pages)
- 1650ETL (23 pages)
- 1650ETL-1K (32 pages)
- 1602-091 (42 pages)
- 1601-081 (36 pages)
- 1602-091 (42 pages)
- 1603-166 (38 pages)
- 1603-166 (42 pages)
- 1603-166 (40 pages)
- 444 XS ST (98 pages)
- 222X383 (84 pages)
- 3020HX (24 pages)
- 3600ETL-1K (36 pages)
- 4500SW (32 pages)
- 6004-080 (34 pages)
- 6002-080 (32 pages)
- 6003-080 (22 pages)
- 6100-083 (56 pages)
- 6100-083 (2 pages)
- 6100-083 (46 pages)
- 6300-087 (59 pages)
- 6300-087 (52 pages)
- 6400-080 (28 pages)
- 6500-087 (48 pages)
- 6500-087 (46 pages)