beautypg.com

Finish installation, Install the cover – Controlled Products Systems Group CSL24V User Manual

Page 26

background image

24

The basic installation is complete.

INSTALL THE COVER

FINISH INSTALLATION

INSTALL THE COVER

TO INSTALL THE COVER

1

Align the tabs on the rear cover with the slots on the chassis and place the

cover over the operator.

2

Secure both sides of the rear cover to the chassis with two 5/16-18 hex bolts

and washers.

3

Align the front cover with the back cover, making sure the grooves line up.

4

Secure the front cover to the chassis with two 5/16-18 hex bolts and washers.

5

Secure the front cover to the rear cover using the 5/16-18 screw.

The operator cover consists of two pieces: a rear cover and a front cover. The front cover can easily be removed to access the electrical box. To access the reset switch slide the

access door up. The front cover and access door can be locked with the key.

TO LOCK THE ACCESS DOOR

From the factory the access door for the reset switch will not be locked. To lock the

access door follow the steps below:

1

Locate the lock tab on the back of the front cover and remove the screw

securing the tab to the cover.

2

Turn the tab 180 degrees, then secure with the screw. The access door can

now be locked.

Tabs on Rear Cover

Slots on Chassis

Groove on Front Cover

5/16-18

Hex Bolts

and Washers

5/16-18

Screw

Access Door

Lock Tab

Factory Default position

(back of front cover)

Access Door