beautypg.com

Gate operation, Pad and operator location, Drt 3520 – Controlled Products Systems Group 3020HX User Manual

Page 8: 8concrete pad construction and layout

background image

8

COnCReTe paD COnSTRuCTIOn anD layOuT

The gate must roll freely with no binding of the wheel, guides, and/or gate hardware before any operator is

connected to the gate.

DRT3520

12

3

/

4

” - Mounting Holes

4

1

/

2

2

1

/

2

1

1

/

2

2

3

/

4

4”

6

1

/

4

24” Pad Size Minimum

20”

Electrical Stub

Up Area

Chain

Gate

Wall

16” - Cover Size

14”

11

1

/

2

Figure 5 (Top View)

10”

Operator

DRT 3520

Figure 6 (Front Mount)