5 installation, English, 4 dimensions 4.3 description of parts – CAME BX-10 Kit User Manual
Page 3: 1 preliminary checks

3
ENGLISH
Th
e data and inf
o
rm
atio
n s
h
own in this dialogue ma
y be changed b
y C
ame C
ancelli A
utomatici S
.p
.A
. at an
y time w
itho
ut pr
io
r war
ning.
4.4 Dimensions
4.3 Description of parts
(mm)
5 Installation
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
5.1 Preliminary checks
Before installing, do the following:
• Make sure that the gate is stable, and that the castors are in good working order and properly greased.
• The ground rack must be well secured to the ground, entirely above the surface and free of any irregularities that may obstruct the
gate’s movement.
• The upper guide rails must not create any friction.
• Make sure that there is a closing and an opening endstops.
• Make sure that the operator is attached to a solid surface and protected from any impacts;
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply;
• Check that any connections inside the container (that provide continuity to the safety circuit) are fitted with additional insulation
compared to other internal live parts;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
9
3
4
2
5
6
7
10
11
1 - Top cover
2 - Settings casing
3 - Control board support
4 - Endstop fins
5 - ZBX10 electronic card
6 - Front cover to control panel
7 - Gearmotor release door
8 - Securing plate
9- Securing bolt
10- Securing screw plate
11- Nut
1
2
8