beautypg.com

5 installation, English, 4 dimensions 4.3 description of parts – CAME BX-10 Kit User Manual

Page 3: 1 preliminary checks

background image

3

ENGLISH

Th

e data and inf

o

rm

atio

n s

h

own in this dialogue ma

y be changed b

y C

ame C

ancelli A

utomatici S

.p

.A

. at an

y time w

itho

ut pr

io

r war

ning.

4.4 Dimensions

4.3 Description of parts

(mm)

5 Installation

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

Before installing, do the following:

• Make sure that the gate is stable, and that the castors are in good working order and properly greased.
• The ground rack must be well secured to the ground, entirely above the surface and free of any irregularities that may obstruct the
gate’s movement.
• The upper guide rails must not create any friction.
• Make sure that there is a closing and an opening endstops.
• Make sure that the operator is attached to a solid surface and protected from any impacts;
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply;
• Check that any connections inside the container (that provide continuity to the safety circuit) are fitted with additional insulation
compared to other internal live parts;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.

9

3

4

2

5

6

7

10

11

1 - Top cover
2 - Settings casing
3 - Control board support
4 - Endstop fins
5 - ZBX10 electronic card
6 - Front cover to control panel
7 - Gearmotor release door
8 - Securing plate
9- Securing bolt
10- Securing screw plate
11- Nut

1

2

8

This manual is related to the following products: