beautypg.com

Burkert Type 2300 User Manual

Page 3

background image

Removing the actuator from the valve body:

Clamp the valve body in a holding device
(applies only to valves which have not yet been installed).

note!

Damage to the seat seal or the seat contour!
• When removing the actuator, ensure that the valve is in open

position.

Control function A:
Without unit control: pressurize the pilot air port 1 with com-
pressed air (5 bar): valve opens.
With unit control: open the valve according to the operating
instructions for the control unit.

Using a suitable open-end wrench, place the wrench flat on the pipe.

Unscrew the actuator from the valve body.

Removing the control cone set:

note!

Important information for the problem-free and safe functioning
of the device!
• The sealing face of the control cone must not be damaged.

Knock out dowel pin with a suitable pin punch.
Pin punch ø 4 mm, for spindle diameter 10 mm.
Pin punch ø 5 mm, for spindle diameter 14 mm.
Pin punch ø 6 mm, for spindle diameter 22 mm.

Remove control cone.

Spindle

Dowel pin

Control cone

Graphite seal

english

Replacing packing gland:
PEEK spindle guide (series production status up to April 2012)

Unscrew the spindle guide with the aid of the installation wrench

2)

and an open-end wrench.

VA spindle guide (Series production status since April 2012)

Unscrew spindle guide using a modified socket wrench

2)

.

SP22

Unscrew the VA spindle guide with the aid of an open-end wrench.

2)

The installation wrench or modified socket wrench is
available from your Bürkert sales office.

Packing gland
PEEK
spindle guide
Spindle
Installation tool

Packing gland tube

Series production status
up to April 2012

Packing gland

VA

Spindle guide

Spindle

Packing gland tube

Hexagon

Series production
status since April 2012

Packing gland
Spacer

Spindle

Packing gland tube

SP22

VA Spindle guide

english

WArnInG!

Risk of injury from parts jumping out!
When the spindle opening is exposed, the individual parts of the
packing gland are pressed out at an undefined speed when the
pilot air ports is pressurized.
• Before pressurizing with control air, safeguard the ambient area of

the discharge opening (e.g. place spindle on a firm base).

Press out packing gland:
Control function A and I Pressurize pilot air port 1 with 6 – 8
bar.
Control function B Pressurize pilot air port 2 with 6 – 8 bar.

Grease the individual parts of the new packing gland with the
upplied lubricant.

Connect the individual parts to the spindle in the specified
direction and sequence.

Push packing gland into the packing gland tube.

Grease thread of the spindle guide (Klüber paste UH1 96-402).

Screw spindle guide back in using the installation tool. Observe
torque (see “Tab. 3”).

Insertion direction for

packing gland parts

Support ring

Upper chevron seals

Upper pressure ring(s)

Pressure spring

Lower pressure ring

Lower chevron seals

Spindle ø 10 mm

Spindle ø 14 mm

Seal set for packing gland SP10 / SP14

Seal set for packing gland SP22

Support ring

Upper chevron seal

Upper pressure ring(s)

Pressure spring

Lower pressure ring

Lower chevron seals

Insertion direction for

packing gland parts

Spacer

Spindle ø 22 mm

english